This week saw the Renault TSF turret/blockhaus fitted to the hull and the start of the Renault FT turret reassembly. The foot pedals and controls were fitted to the Renault FT crew cabin and all the paint for the completion of the project is on order. The Renault FT turret should be finished early next week. The remaining missing small brackets in the crew cabin areas have been restored or fabricated and the fitting of these pieces has started.