Body to chassis mounting brackets have been repaired for the TWC Sd.Kfz.223. Those missing are being fabricated. The front armour and bumper have all been fitted.
We hosted a group of motorcycle combination enthusiasts from the Netherlands. They had driven from their homes with their wives. A very interesting meeting. Images of the event are posted for you here.
Work on the Sd.Kfz.223 3.Serie of the Foundation continues to bring it in line with that of the TWC.
On a separate note the large and small cups for the grenade racks have been spun for the Sd.Kfz.222 4.Serie, the Sd.Kfz.223.3.Serie, TWC Sd.Kfz.223 and our Sd.Kfz.261.5.Serie. These are now ready to be fitted to their frames once they are ready for the armoured cars.